27 July, 2010

Rapidpass Flexi

IMG_2224
A New Eight Couches of the Putra LRT.


Malaysia really needs to have an integrated transportation system in order to provide efficient services to users. Congratulation to RapidKL for its initiative to introduce a new ticketing system namely Rapidpass Flexi. The new ticketing system was introduced on 1st June 2010.

In order to use the system one needs to have a Touch and Go card. The Touch and Go cards are available at most of the LRT stations. Rapidpass Flexi can be loaded to the Touch and Go card. Rapidpass Flexi can be used specifically for RapidKL buses, LRT as well as monorail. Users can also purchase an integrated Rapidpass which can be used for all three mode of transport (RapidKL buses, LRT and Monorail). Users can purchase the Rapidpass Flexi based on number of days such as one, three, seven, 15 or 30 days. The rapidpass can be purchased from customer service counters at LRT stations. For more information, please refer to this web site http://www.rapidkl.com.my/.

Personally, I really like the ticketing system because of its convenience to the users. However, RapidKL still needs to improve the reliability and timing of their bus services in order to attract more users to use the services.

30 March, 2010

Light Rail Transit at KL Sentral

IMG_4928e

Today, while waiting to purchase Express Rail Link (ERL) ticket to Kuala Lumpur International Airport (KLIA), I had a chance to capture an image of the two-Car train LRT. My real intention was to capture an image of a four-Car Train LRT. Unfortunately, after waiting for about an hour, the four-car train did not pass through the KL Sentral.


There seemed to be some kind of disruption regarding the LRT train schedule today. It seemed that the train only travelled at an interval of 30 minutes. Just imagine that within one hour waiting period, I only managed to see only twice the LRT train passing by. Unluckily, both trains were the two-car train.

During normal hours, LRT trains usually travel at an interval of every two or three minutes.

Also, looking at the picture, the development along the LRT track is becoming very intense. I like the traffic system surrounding the KL Sentral because there is integration of all sorts of transportation systems such as Buses, LRT, ERL, Taxi, Pedestrian and passenger cars. The traffic system for the KL Sentral seemed to be able to disperse traffic effectively even though during peak period, congestion occurs.

31 December, 2009

New Four-Car Train for Kelana Jaya Line

LRT Station Queues

One of the LRT stations along the Kelana Jaya Line


Kelana Jaya Line LRT now have new four-car trains as opposed to two-car train previously.

The four-car train has a capacity of 800 passengers.

The train is the newest version of Bombardier Transportation’s Advanced Rapid Transit Mark II driver-less trains, which are designed in Canada.

The new set of trains will ease passenger congestion using the facilities especially during peak hour.

However, the effectiveness of the new trains to reduce congestion still depend on the frequency of the train plying the kelana Jaya Line.

P2220976e
With the increase in the capacity of each train and adjusting the appropriate frequency of the train will definitely solve the overcrowded passengers problem as in the past.

According to this report, 35 four-car train had been ordered and the deliveries of all the train will be completed until the year 2011.

IMG_3274

The two-car train of the Kelana Jaya Line.


17 September, 2009

Extension of LRT Stations

IMG_2337-LRT

Syarikat Prasarana Negara Bhd, is proposing to construct an extension of the Kelana Jaya and Ampang Light Rail Transit (LRT) line. According to the report, the RM7 billion project includes 13 additional stations each for the Kelana Jaya and Ampang line, including an interchange station at Putra Heights. The Kelana Jaya extension comprises of a 17-km track whereas the Ampang Line extension comprises of 17.7-km track. The extension projects are expected to be completed in 2012.
Currently, the documents and proposed plans related to the project are available for public review at Petaling Jaya City Council, Subang Jaya Municipal Council (MPSJ), City Hall headquarters, Shah Alam City Council and Department of Railway at Menara Dayabumi. The documents can be reviewed from Monday to Friday, 9am to 5pm. The public inspection ends on Dec 14.
 
However, the developers of the extensions projects should consider the following areas of concerned:
 

  1. The most important aspect is to ensure the choice of train system that can be easily maintained and easily upgraded in the future. For example, due to popular demand, the capacity of each train need to be increased by adding additional coach to the train and make sure that the procured train system allows such an extension. As an alternative, the number of trains need to be increased in the future (to increase train frequency) to meet the travel demand. Make sure that the cost of adding additional train in the future are included in the procurement cost. 

  2. For the nation, there should be a Transport Masterplan to cater for future developments of all public transport facilities. For the rail transit system, there should be a masterplan which will indicate which lines that need to be constructed in the future. For example, currently there are no such lines as circumferential lines which could be used for users travelling along the outskirt of the city center. Also, there is no such line as Mass Rapid Transit (MRT) to transport high passenger volume at a very high speed for certain distances. Additionally, there should be other LRT lines to reduce the loading on the existing LRT lines to ensure that the level of service of the facilities is within reasonable limit during peak periods.

  3. Several stations should be constructed at properly located growth area in the future in order to save future construction costs. The proposed future developments will be in popular demand as the results of the availability of the LRT station in the vicinity of the development. The construction of the stations, even though it will not be operational sometimes in the future, will ensure proper land used and transportation planning being carried out along the LRT line. Furthermore, the cost of constructing the stations in the future will be prohibitive and also will affect the operation of the existing line.

  4. Ensure proper allocation of Park-and-Ride facilities at the LRT stations. In order to attract more users using the LRT facilities, users must be able to easily find available parking places. The management of the park-and-ride facilities must provide a very high security services at the parking places. Private vehicle users will be readily switched their mode of transport to the LRT based transport given that their level of comfort and security are being addressed properly.

  5. Proper traffic impact assessment (TIA) needs to be carried out at each of the park-and-ride facilities in order to reduce congestion around the area. Congestion occurs if the number of available parking facilities is limited causing vehicles to be parked surrounding the vicinity of the park-and ride facilities which can cause nuisance to the community.

  6. Feeder bus and taxi services at the park-and-ride facilities should be provided at appropriate capacity and frequency. This will further attract users to use the LRT services. If the feeder system is very poor than the overall level of service of the LRT system will be compromised. Thus, planning of the train frequencies should be synchronized with the feeder bus services frequency to provide a smooth free travel from one location to the other.

  7. Social and environmental impact of the project should be carried out. Sensitive residential areas need to be screened using properly designed sound barriers.

  8. Congestion level in term of number of passengers in a train at any particular time and number of passengers queuing at train stations at a particular time need to be taken into consideration. The management of the LRT system should be able to deploy additional train in case that the level of service of the facilities dropped at certain level of service. In order for this to happen, the operators must have enough number of train available during peak hours.

  9. With the extensions of the LRT line, more passengers will use the line for long distance travel. The extreme case will be that most users will use the train to travel from one end of the line to the other end of the line. Or most users will use the LRT to travel from the Suburb to the city center thus depriving other users along the line of their place (the users have to wait longer for available place) in the train. Thus, for LRT to operate properly, the distance covered for each line should not be too long. In order to overcome this issues, additional line should be constructed to accommodate the various users need. Also, the Government should consider constructing a Mass Rapid Transit (MRT) for the purpose of carrying large number of passengers at a very high speed for long distance travel. The MRT line only allows passenger to disembark at certain interchange stations along the line.
I am sure that any readers interested in this topic will have some other ideas or concerns regarding the LRT services. I really appreciate and very thankful if you could provide your inputs by commenting on this post.


Reblog this post [with Zemanta]

25 August, 2008

Tracking the transport system

Hopefully, the public transportation issues can be resolved with the recent visit by the prime minister. This similar issues had been highlighted before in my previous post.

The problem is very real and also need some kind of common sense to solve. However, it really needs the prime minister to give them a ride and without any police entourage, then he can experience the transportation problem himself. Hopefully, that will not be the end of it because the problem has been the same ever since and it will become worst if nothing is being done due to the population increase and due to the high fuel price.

read more digg story

23 June, 2008

Consider riding an LRT

Star LRT

LRT is becoming popular as a mode of transport due to the increase in fuel price. Is LRT a choice for you?

The answer depends on your own situation. Off course it is not my choice here since there is no LRT available. However, if I do visit KL, I will certainly give it a ride. However, the experience of using LRT is not always pleasing since during peak hour, it is too crowded and all of the acceptable privacy space had been violated. You have to endure the smell, the crowd, etc. during the entire ride.

To make the matter worst, you cannot get taxi services during peak hours when you arrived at the designated station. I cannot understand the taxi driver business plan. Everytime the road is congested during peak hours, they will run away from the customers. Their reason is always traffic jam. Logically, they have to take every opportunities to get customers when other taxi drivers don't want to do that. I don't see that they will be losing anything to transport passenger during peak hours because their taxi runs using meter. The slower the taxi, the higher the figure being spurted out.